Service Size Completed
|
Challenge The Contra Costa Water District was faced with an expiring lease on
an existing building for their Construction and Engineering departments.
W.E. Lyons was selected through the competitive bid process to deliver
a new building via the design-build Solution The design-build team worked closely with the District utilizing user-group focus sessions to carefully plan the layout of the new Administration Building. Since the new building houses the Districts Emergency Operations Center, the structural framework of the building was designed as an essential facility. Security was also carefully addressed allowing public acess at pre-determined areas within the new structure. Highlights
|
||
|
|
|||