to previous projectto next project

Service
Site Development and Concrete Tilt-Up Building Construction

Size
18,000 square feet

Completed
2001

 

 

 

 

 

 

Challenge

Centurian Surplus was in need of additional office space with expandability for the future. The preliminary design documents for the project had been started by another firm that was non-respnsive to the owner’s schedule.

Solution

Through the design-build method, W.E. Lyons completed the construction documents and obtained the building permit in 90 days. Utilizing a Varco-Pruden metal building system, W.E. Lyons provided the owner a clear-span building for greater floor plan flexibility. The site work and shell construction was completed in 180 days.

Highlights

  • 18,000 square foot concrete tilt-up building with metal frame roof
  • 1.2 acre site development
  • Metal standing seam roof
  • Clear-span construction
  • Drivit exterior finish
  • Low heat gain glazing


Helpful Links

Last updated: March 2007, © 2003 - 2007 W.E. Lyons Construction Co., Inc.
CA License #180607
All rights reserved. See Legal Notices for details.