RED HAWK
RANCH
FREMONT, CALIFORNIA
Water infiltration was prevalent at Red Hawk Ranch apartments. There was also
a long list of non-envelope related construction deficiencies left by the original
developer/builder which were in need of repair. Through partnering with the
Architect, the project team was able to meet the Owner’s requirements
and short schedule. Phased construction was implemented to avoid restricting
tenant access. By dividing work and living areas and adjusting working hours,
tenant disruption was kept to the absolute minimum.
SERVICES:
General Contracting
Design-assist
Value Engineering
Occupied Space Construction